Davis Bacon Labor Standards for ARRA Weatherization
Reference Resources
- A Desk Guide To The Davis-Bacon Act (U.S. Department of Energy site)
- U.S. Department of Energy (DOE) guidance on revised wage determination issued by Department of Labor (DOL) on December 11, 2009 (PDF) (Remains in effect March 2013.)
- Revised Davis-Bacon Wage Determinations For The Weatherization Assistance Program; DOE Weatherization Program Notice 10-7 Effective Date: December 14, 2009, US Department of Energy Program Guidance page (http://www1.eere.energy.gov/wip/wap.html)
- Contractor Clearance: System for Award Management (SAM site)
Forms
- ARRA-WAP Pre-Construction (PDF)
- WH-347: DBRA Certified Payroll Form
(http://www.dol.gov/whd/forms/) - Payroll Deduction Authorization (DOC)
- Payroll Signature Authorization Form (DOC)
- WEA 6.01 - Final Wage Compliance Report (DOC)
- WEA 6.02 - Appointment of Labor Standards Officer (DOC)
- WEA 6.03 - Request for General Wage Decision (DOC)
- WEA 6.11 - Record of Employee Interview (DOC)
- WEA 6.14 - Start of Construction Notice (DOC)
- Statement and Acknowledgment of Labor Clauses Included in Contracts, GSA Form: SF1413 (Forms Library - GSA.gov)
- DOL Request for Authorization of Additional Classification and Rate, DOL SF 1444 Listed on the GSA Forms Library index page.
- Subcontractor Request for authorization of additional worker classification (DOC)
The Program Services Division Davis-Bacon staff provides technical assistance regarding federal and state labor standards requirements. Send an email to a labor standards staff member directly.
